Setting up reviewer groups for valve movement requests

Choose who approves valve movement requests by creating reviewer groups in Admin.

Written by John Ennis

Reviewer groups decide who must approve a valve movement request before the work goes ahead. You set them up once in Admin, and every request raised in Valve Management then follows the same approval route.

A valve movement request needs at least one reviewer group before it can be submitted, so this is one of the first things to configure when your team starts using Valve Management.

How reviewer groups work

  • Every request needs an approval from one picked reviewer in each reviewer group.

  • With one group, requesters pick from a single Reviewers list, and no group name is shown.

  • With several groups, requesters pick a reviewer from each group, and each group's name is shown on the request as the group whose approval is needed.

  • Any reviewer in a group can approve or sign off on the group's behalf.

  • A user can only belong to one reviewer group.

Step 1: Open the Workflow settings

Go to Admin, then under Valve Management select Workflow. The Reviewer Groups panel lists any groups already set up, with their name, reviewers, status and actions.

Step 2: Add a reviewer group

Click Add reviewer group in the top right of the Reviewer Groups panel.

Step 3: Name the group

Enter a Name. This is shown on each request as the group whose approval is needed, so use a name requesters will recognise, such as the team or discipline responsible (for example, Operations or Integrity).

Step 4: Choose the reviewers

Open the Reviewers list, search by name or email, and tick each person who should review on behalf of this group. You can select several people. Remember that each user can belong to only one reviewer group.

Step 5: Save

Click Save. The group appears in the Reviewer Groups table, and the count beside the panel title updates. Repeat these steps for each group whose approval a request should need.

Related workflow rules

The Rules panel on the same page controls what happens around the approval step:

  • Require sign-off after execution – When this is off, executed requests close as soon as their valves are logged. Turn it on if a reviewer should sign off on the work after it has been carried out.

  • Allow logging a valve without a request – When this is on, a single valve can be logged straight from its side panel or asset page without raising a request.

Next steps

Once your reviewer groups are in place, your team can start raising requests. See Submitting a Valve Movement Request for the requester's side of the workflow.

If you need help setting up your approval workflow, reach out to the Enaimco support team using the chat icon in the bottom-right corner of the app.