The Risk Matrix determines how asset risk levels are assigned based on the combination of LoF and CoF.
Steps
Go to Admin → Risk → Risk Matrix
Set:
Maximum LoF level (rows)
Maximum CoF level (columns)
Maximum risk level
Edit each matrix cell to assign a risk level (e.g., 1–5)
Example
High CoF + High LoF = High Risk → Will drive more frequent inspection.
Tip
Keep your matrix aligned with:
Company risk policy
Regulatory integrity requirements
Next steps: Configuring Consequence of Failure Values