To build a 3D operational twin, Enaimco's team of subsea engineers use your field’s engineering and inspection data.

Required data may include:

  • As-built drawings (primary source)

  • Engineering models (e.g., CAD files) for reference

  • GIS data or surveyed coordinates for placement

  • Historical inspection reports or records

Updates over time:
Yes — the 3D model can and should be updated throughout the field’s lifecycle to reflect changes. Updates are part of the ongoing service agreement.

If you’re unsure about your data readiness or update process, reach out to the Enaimco team for guidance.